Customer success story

Delivering a Future-Ready Hybrid MSP & Services Procurement Model at Global Scale

A national, heritage UK retailer with a highly dispersed estate faced growing pressure to secure temporary labour in a tightening market while maintaining strong governance, cost control and worker experience.

Impact at a glance
Fulfilment, supplier control and workforce visibility. Built to scale through peak demand.
~75% to ~100%
Fulfilment uplift in challenging locations
50%+
Reduction in supplier numbers
5%+
Ongoing annual savings on managed spend
1
System for requisitioning, onboarding, time capture and reporting
Real-time
Visibility of utilisation, cost and performance
A more resilient model: capable of scaling through peak demand.
 
The Situation

A national UK retailer needed to stabilise fulfilment, improve visibility and build a more resilient model for temporary labour.

A national, heritage UK retailer with a highly dispersed estate faced growing pressure to secure temporary labour in a tightening market while maintaining strong governance, cost control and worker experience.

The organisation operated across hundreds of sites with differing demand patterns, skill shortages and local labour market constraints. Fulfilment levels were inconsistent, with some locations experiencing rates as low as 75%.

Partnering with Guidant Global, the organisation set out to stabilise fulfilment, improve visibility across its contingent workforce management and build a more resilient model capable of scaling through peak demand.

Initial fulfilment challenge
As low as 75%
Some locations experienced fulfilment rates as low as 75% across a highly dispersed estate.
Estate complexity
Hundreds of sites
The organisation operated across hundreds of sites with differing demand patterns, skill shortages and local labour market constraints.
The Challenge

Inconsistent fulfilment and manual processes created limited visibility, increased compliance risk and made it difficult to control spend.

Manual processes made it difficult to control spend, manage suppliers effectively and respond quickly during peak demand.

01
Differing demand patterns

The organisation operated across hundreds of sites with differing demand patterns, skill shortages and local labour market constraints.

02
Limited visibility

Manual processes created limited visibility and made it difficult to control spend and manage suppliers effectively.

03
Compliance risk

The existing approach increased compliance risk and made it harder to respond quickly during peak demand.

The Solution

A hybrid managed service model combining direct sourcing with a rationalised, performance-managed supplier network.

Technology replaced spreadsheet-based processes, creating a single system for requisitioning, onboarding, time capture and reporting.

01 Hybrid managed service model +

A hybrid managed service model was introduced, combining direct sourcing with a rationalised, performance-managed supplier network.

02 Technology replacing manual processes +

Technology replaced spreadsheet-based processes, creating a single system for requisitioning, onboarding, time capture and reporting.

03 Reusable talent pools +

Reusable talent pools were developed to improve redeployment.

04 Supplier optimisation and rate benchmarking +

Supplier optimisation and rate benchmarking strengthened cost control and compliance across the workforce.

Results

The new approach improved fulfilment, reduced supplier numbers and delivered clearer workforce visibility.

As a result of this new approach to contingent workforce management, fulfilment increased from approximately 75% to close to 100% in challenging locations. Supplier numbers were reduced by more than 50%, improving quality and consistency.

~75% to ~100%
Fulfilment uplift in challenging locations
50%+
Supplier numbers reduced
5%+
Ongoing annual savings on managed spend
Real-time
Visibility of workforce utilisation, cost and performance
Stronger
Audit readiness

Fulfilment Improved

Fulfilment increased from approximately 75% to close to 100% in challenging locations.

Quality and Consistency Improved

Supplier numbers were reduced by more than 50%, improving quality and consistency.

Spend, Audit Readiness and Visibility Strengthened

The programme delivered ongoing annual savings of over 5% on managed spend, strengthened audit readiness and provided clear, real-time visibility of workforce utilisation, cost and performance across the national estate.

Book a discovery call with
our workforce experts.
Talk to our team →